UNI 8 Cable System Installation & Post Design
Excalibur designed the posts for this system and installed a UNI 8 Cable System on them. Workers can stay 100 percent tied-off while working on the solar arrays on this new elementary school in Northwest Portland.
Post Design for UNI 8 Horizontal Lifeline System
This is the post design for the UNI 8 Horizontal Lifeline System for the new elementary school in Northwest Portland. This system allows workers to stay 100 percent tied-off while working on the solar panels on the building.
Single-Point Anchor Installation
Roof preparation for the window washer fall restraint anchor installation.
Single-Point Anchor Installation
Completed roof anchor installation for window washer fall restraint.
Horizontal Lifeline on Ferry Boat
Uni8 intermediate bracket for window washer horizontal lifeline tie off.
Fall restraint & fall arrest system
Lower Monumental Dam
Single point anchor in concrete
Lower Monumental Dam single point anchor (SALA) in concrete